Visualisierung der Modernisierung Franz-Josefs Bahnhof

Franz-Josefs Railway Station

Bright, friendly and barrier-free. This is how you will experience Ternitz Railway Station from spring 2022.

New, fresh appearance

Inviting, bright and comfortable: the important inner-city transport hub in Vienna's 9th district awaits you after the modernisation. When the work is completed in July 2023, you will find full barrier-free access and a modern entrance hall. In addition, we are renewing the tracks and switches between Vienna Franz-Josefs train station and Vienna Spittelau.

Your benefits

    • Access to the train without steps: barrier-free design of the entire station.
    • Pleasant quality of stay: more comfort and a contemporary appearance
    • Modern, state-of-the-art track system

Vier Jahre Bauzeit

Im November 2024 wurde der modernisierte Franz-Josefs-Bahnhof eröffnet. Die Arbeiten am neuen Althan Quartier oberhalb des Bahnhofs laufen seit Dezember 2020, jene im Bahnhofsbereich begannen im November 2021. Durch die Überplattung des Franz-Josefs-Bahnhofs war die Baustelle sehr aufwändig. Im März 2023 konnte die Modernisierung der Gleishalle abgeschlossen werden. Ende 2024 folgte auch die Fertigstellung der Eingangshalle. 

Daten & Fakten

  • Bauzeit Gleishalle

    November 2021 - März 2023

  • Bauzeit Eingangshalle

    November 2021 -  November 2024

  • Frequenz

    8.000 Kund:innen pro Tag

  • Spannende Zahlen

    1.800 Laufmeter neues Gleis
    12 Stück neue Weichen
    4.500 Tonnen Gleisschotter
    4.600 m² Natursteinbelag
    1.350 m Taktile Bodeninformation
    185 t Stahl
    1.200 m² Glasverkleidung
    2.500 m² Deckenverkleidungen
    1.110 Laufmeter Sonderbahnsteigkanten