Project overview
In collaboration with the City of Vienna and the Penzing district, the historic Vienna Hütteldorf light rail station and its northern forecourt are being comprehensively restored and upgraded. The modernisation of the rail infrastructure will improve interchange facilities and create attractive conditions for long-distance services, REX and S-Bahn services – for example, for the planned 15-minute frequency of the S80, which will be made possible by enhancing the attractiveness of the connecting line.
A key component is the double-tracking of the S45 between Vienna Hütteldorf and Vienna Penzing. This will enable a more frequent service and the construction of the new ‘Vienna Baumgarten’ stop – for even greater convenience in local transport. Thanks to the renewal of railway bridges and the partial widening of road crossings, pedestrians and cyclists will benefit from an improved traffic situation.
This will ensure that the historic station is fit for the future: as a modern, multimodal transport hub on the most important commuter route in the west of Vienna.
Your benefits
-
- Restored historic station building
- Fully accessible
- Attractively designed northern forecourt offering a pleasant environment
- Improved connections between all modes of transport
- Prerequisites for more frequent S45 services and better connections between the REX and long-distance services
- New Vienna Baumgarten stop
- Refurbished railway bridges with wider footpaths and cycle paths
Inhalte der Informationsveranstaltung
Unsere Infoplakate geben Ihnen einen vertiefenden Einblick in die geplanten Maßnahmen.
(Stand November 2026)
Planned measures:
- Refurbishment of the station building and forecourts
The station building will be refurbished and the platforms and track layout will be rebuilt. In collaboration with the City and the 14th District, the forecourt on the north side will be redesigned to improve visibility, thereby enhancing the quality of the environment for local residents and passengers. The forecourt south of the western line will also be modernised.
- Reconstruction of railway infrastructure
The track layout between Ameisgasse and Wien Wolf in der Au will be rebuilt to meet future requirements. In particular, the track layout at Hütteldorf station and at Penzing freight station will be adapted and modernised. Extension of the S45 and construction of the new Wien Baumgarten stop
To enable a 7.5-minute service interval on the S45 suburban line in future, the section of the S45 between Wien Hütteldorf and Wien Penzing will be upgraded to double track. The additional Wien Baumgarten stop near Zehetnergasse will in future offer even more people easy access to ÖBB’s environmentally friendly local transport services.
- Renovation of railway bridges
In addition, the railway bridges in the area of Deutschordenstraße, Hochsatzgasse and Zehetnergasse are being renovated. Some of the road crossings are being extended and footpaths and cycle paths widened to meet the demands of increasing road traffic.
Timetable
The planning documentation required for submission under railway legislation is currently being finalised. Submission to the relevant authority is scheduled for 2026.
As things stand, the main construction work is expected to begin at the end of 2029. Full completion is scheduled for 2035.