Three stages in the modernisation of Bregenz Train Station

The modernisation of Bregenz Train Station is taking place in three stages. Step by step, a modern and well-connected transport hub is taking shape here.

  • Stage 1: The first major milestone was reached with the new Hypo underpass and the extended platforms. It connects the town, the lake and the railway in an accessible and convenient way.
  • Phase 2: The temporary station building offers modern service areas for passengers and staff and will remain in operation until the new station is completed.
  • Phase 3: The comprehensive redevelopment of the entire station area as part of the Bregenz Mitte urban regeneration project.

Facts & Figures

  • Construction period

    Phase 1: May 2022 – May 2024
    Phase 2: April – July 2025 (customer areas) and October 2025 (overall completion)

  • Project partners

    ÖBB-Infrastruktur AG, State of Vorarlberg, City of Bregenz

  • Investment volume

    Phase 1: approximately 15 million euros
    Phase 2: 4.5 million euros

  • Usable floor area

    Temporary premises: 795 m² across 3 storeys

  • Workstations

    107 modern workstations for ÖBB, Postbus and VVV

  • Additional facilities

    Bakery, waiting areas, toilet facilities, new lift at the station platform, short-stay car park and 180 covered cycle parking spaces

  • Green spaces

    290 m² + green roof

Your benefits

Phase 1: Hypo Underpass

  • Direct link between the city centre and the lakeside
  • Accessible facilities thanks to three new lift systems
  • Convenience for cyclists: lifts with a cabin length of 3.4 m each (suitable for special-purpose bicycles and bicycles with trailers) and guide grooves on staircases
  • Enhanced safety through a bright lighting scheme and CCTV
  • A well-thought-out design featuring 324 m² of green roofs and climate-controlled concrete
  • Refurbished platforms with modern waiting facilities and guidance systems

Phase 2: Temporary station building

  • Modern comfort: bright, functional spaces with a waiting area and a bakery
  • Quality of service: state-of-the-art ticket offices, travel centre and toilet facilities
  • Convenient access: easy access to the platform via new escalators and a lift
  • Well-thought-out design: timber architecture and green spaces
  • Central location: right in the station area, integrated into the future ‘Bregenz Mitte’ development

Frequently Asked Questions

  • Why was a temporary building constructed?

    The existing station no longer meets current technical and structural standards. A new building had originally been planned for as early as 2025, but developments arising from the ‘Bregenz Mitte’ urban regeneration project have made it necessary to redesign the station. The temporary building will serve as a stopgap until the new Bregenz station is built.

  • Why is the old station building still standing and not being demolished straight away?

    The existing station building is no longer owned by ÖBB, so the company has no say in when it will be demolished.

  • How long will the temporary station building remain in use?

    The temporary station building is intended to be used for the entire duration of the station’s refurbishment. It will remain in use until the new station is completed. The main construction work is scheduled to begin in the early 2030s. The temporary station building will only be removed once the new station building has been completed. This means it will be in use for 7–10 years.

  • Will the temporary building be dismantled once the new station is completed?

    Yes. The temporary building is designed as a stopgap solution. As soon as the new station is operational, it will no longer be needed and can be dismantled.

  • Why was money invested in a temporary facility?

    The alternative building is more than just a temporary facility: it offers modern, accessible service areas and attractive workspaces. In this way, ÖBB is ensuring that passengers and staff enjoy the best possible conditions throughout the construction period.